Work by Suffolk Highways will mean the closure of a busy road here in east Suffolk.
Bridge strengthening preparation works to the North of Snape Bridge, is scheduled to take place between the 3rd and 7th August.
This means the road will be closed at Snap Bridge, 24 hours each day for the full duration of the works and the Snape Maltings will remain open.
Diversions signs will be in place and take vehicles towards the Friday Street junction of the A12 – but pedestrian and cyclist access will be possible.
Post comments (0)